Enterprise Networking |
DNAC | Remote or On-site | 5-days | Fixed | Install, configure DNAC (single DNAC), ISE, onboarding of end user devices through wired or wireless network on edge switches, setup and configure Assurance, Automation (PnP) configuration, SWIM configuration. Includes 5-days of remote support. |
DNAC | Remote – On-site | Variable | Scope | Installation of DNAC platform. Can be remote, on-site, or a combination. |
DNAC / SDA | Remote – On-site | Variable | Scope | Day 2 Management of customer’s DNAC and/or SD-Access environment. Includes on-site and/or remote support, connection into the customers ticketing system, regular reports. |
SD-Access | Remote – On-site | 5-days | Fixed | Install, configure DNAC (single DNAC), ISE, Fabric provisioning (Underlay & Overlay), Host onboarding, Policy Administration, Wireless enabled. 5-days remote support. |
SD-Access | Remote – On-site | Variable | Scope | Installation of SD-Access solution. Can be remote, on-site, or a combination. |
SD-WAN | Remote – On-site | 5-days | Fixed | Proof-of-Concept. Deploy vManage, vSmart, vBond controller, overlay fabric up to 5 sites, zero touch provisioning, Security knowledge Transfer, Whiteboard session. NterOne hosted equipment used. Up to 5-days of remote support. |
SD-WAN | Remote – On-site | Variable | Scope | Installation of Cisco SD-WAN solution. Can be remote, on-site, or a combination. |
DNAC / SDA | Remote – On-site | Variable | Scope | Day 2 Management of customer’s SD-WAN environment. Includes on-site and/or remote support, connection into the customers ticketing system, regular reports. |
Mobility & Wireless | On-site | Variable | Scope | Installation of Cisco Wireless. Includes design, configuration, and Day 2 operations training. |
Meraki | On-site | Variable | Scope | Installation of Cisco Meraki. Includes design, configuration, and Day 2 operations training. Can be remote, on-site, or a combination. |
Data Center |
ACI | On-site | 5-days | Fixed | Installation of ACI platform dependent on customer environment. (3) APIC Controllers, (2) Spine, (4) Leaf solution. Includes ACI training and mentored install. |
ACI | On-site | Variable | Scope | ACI Installation. Tested, Validated, migration documentation |
HyperFlex | Remote | 4-days | Fixed | 4-days of Hx installation and instruction. Includes whiteboarding session, UCS configuration Hx platform (ESX or HyperV) and Day 2 Operations training |
Intersight | Remote or On-site | Variable | Scope | Installation and configuration of Cisco Intersight. Can include remote, on-site or a combination. |
ACI + Hx + Intersight + CloudCenter | Remote or On-site | 10-days | Fixed | APIC Install, UCS Domain Initialization, Hx Install, Intersight Discovery. Fabric limited to 3 Spines, 6 Leaf switches; Hx up to 5 nodes. 2 on-site engineers for 10-days. |
UCS / Nexus / SAN | Remote or On-site | Variable | Scope | Installation of Cisco Data Center Infrastructure. Includes UCS, Nexus, and SAN devices. Can be remote, on-site, or a combination. |
Intersight | Remote or On-site | 1-day | Fixed | Cisco Intersight Adoption Services |
Nexus Dashboard | Remote or On-site | 2-days | Fixed | Cisco Nexus Dashboard Adoption Services |
Cloud Center | Remote or On-site | Variable | Scope | Installation of Cisco CloudCenter. Can be remote, on-site, or a combination. |
Security |
ISE | Remote or On-site | Variable | Scope | Install Cisco ISE solution. Can include remote, on-site or a combination. |
Secure Workload (Tetration) + ISE + FTD | Remote or On-site | 15-days | Fixed | Install, configure Tetration-V, ISE, and FTD. Integrate solutions by creating scopes, roles, users, & FTD FW configurations. Configure HW sensors in Cisco switches for Tetration and .1x and MAB configuration. 2 onsite engineers for 20-man days and 5-days of remote support. |
Secure Network Analytics (Stealthwatch) | Remote or On-site | Variable | Scope | Install Cisco Stealthwatch solution. |
Firepower Threat Defense | Remote or On-site | Variable | Scope | Install Cisco Firepower Threat Defense solution. |
Umbrella | Remote or On-site | 5-days | Fixed | 5-day remote Cisco Umbrella POC. |
Umbrella | Remote or On-site | Variable | Scope | Installation and configuration of Cisco Umbrella. Can include remote, on-site or a combination. |
AMP | Remote or On-site | 5-days | Fixed | 5-day remote Cisco Advanced Malware Protection POC. |
AMP | Remote or On-site | Variable | Scope | Installation and configuration of Cisco Advanced Malware Protection. Can include remote, on-site or a combination. |
SecureX | Remote or On-site | Variable | Fixed | SecureX Activation & Adoption Services |
Email Security Appliance | Remote or On-site | Variable | Scope | Installation and configuration of Cisco Email Security Appliance. Can include remote, on-site or a combination. |
Web Security Appliance | Remote or On-site | Variable | Scope | Installation and configuration of Cisco Web Security Appliance. Can include remote, on-site or a combination. |
MultiDomain |
SDA, SD-WAN, ISE | Remote & On-site | 15-days | Fixed | Includes install and configure of DNAC Cluster, Cisco ISE, integrated ISE into DNAC, SD-WAN (vManage, vSmart, vBond controllers), Up to 10 remote sites. 10-days of on-site engineer support + 5-days of remote engineer support. |
SDA, ACI, ISE, SD-WAN, FTD | On-site | Variable | Scope | Design, Installation, configuration, Day 2 training for any combination of the following solution SDA, ACI, ISE, SD-WAN, FTD |
Collaboration |
CUCM, IM&P, Unified Expressway | Remote or On-site | 5-days | Fixed | Cisco Collaboration Mobile & Remote access includes: CUCM, IM&P, Unified Expressway, Jabber Desktop, Jabber Smart Phone. |